Originally written in French. Translated by AI — the meaning has been preserved, not the prose.
Main idea
For a long time, the detailed specification was a rational response to scarce development time. A misinterpretation cost several developer days; it was better to spend Product Manager time on user journeys, mockups and acceptance criteria to save time building.
That calculation forgot that specification has a cost of its own: understanding the need, representing the screens, writing up the special cases, passing it on, answering questions, maintaining the document when the product changes. Two hours spent describing an ordinary feature are justified against two or three days of development. They are much harder to justify when an AI agent can build the feature, test it and fix it while the Product Manager works on something else.
So the criterion changes. The right level of specification is not the one that minimises the risk of having to change a first implementation; it is the one that minimises the sum of describing, building and fixing, given the risk you are prepared to accept. For a VAT rate management screen in an ERP, whose rules, components and conventions are already known, asking for the screen, using it and then fixing it can cost less than describing it button by button.
Why it matters
The traditional method treated specification time as free, because it was small next to development time. Making it visible turns the level of specification into an economic variable, to be set feature by feature, rather than a quality standard applied everywhere.
Nuances and limits
Lower production costs make no feature free: the code will have to be maintained, the decisions owned, and a mistake can still be expensive.
The calculation only holds where the rules, components and conventions already exist. Without them, the short request pushes the work of describing over into the fixes.
Order of magnitude reported on a personal note-taking app: about ten hours of requests and feedback with the AI, against thirty to forty hours estimated to specify the same features exhaustively. This is a retrospective estimate, not a timed measurement.
Open questions
- How do you measure the total cost of a feature when its fixes are scattered across many short exchanges with an agent?